Installation Check List For MCC's & VFD's. |
MEP Contractor |
|
|
|
|
|
|
|
|
Locatio / Area : |
Verification Sign-off |
||
|
S.No. |
Activities / Items to be Inspected |
Engineer |
QCI |
|
1 |
Check the MCC's / VFD's installed have an approved submittal. |
|
|
|
2 |
Ensure the drawings used for installation are correct and approved. |
|
|
|
3 |
Verify factory test roports and Consultant approved factory witness certificate. |
|
|
|
4 |
Inspect the concrete bases for suitability as per drawings. In case of wall mounted panels, ensure the adequate supporting arrangement. |
|
|
|
5 |
Inspect the MCC's upon receive at site and ensure that the panel free from damages. |
|
|
|
6 |
Ensure all indication lamps, meters and other easily breakable items are undamaged. |
|
|
|
7 |
Ensure adequate clearance around the panel as approved shop drawings. |
|
|
|
8 |
Check the identification of the panel , incoming and outgoing breakers as against approved shop drawings. |
|
|
|
9 |
All cables and wires are terminated and identified. |
|
|
|
10 |
Check the tigthness of all terminations. |
|
|
|
11 |
Check the identification ferruling of internal panel wiring as against approved drawings of the manufacturer. |
|
|
|
12 |
Check the interlock with other services are provided as per approved drawing of the manufacturer and specification. |
|
|
|
13 |
Check the glanding and termination of the cables ( Incoming and Outgoing ) and ensure the same are grounded. |
|
|
|
14 |
Ensure that the panels are protected from damages during the construction works. |
|
|
|
15 |
Final inspection for the complete installations as per specifications / approved submittals / manufacturers instruction. Prior to DEWA ( Local Authoroty ) inspection |
|
|
|
Comments / Remarks, if any |
|||
|
|
|||
|
|
|||
|
|
ETA - QA/QC Engineer |
||
|
Signature : |
|
|
|
|
Name : |
|
|
|
|
Date : |
|
|
|