TABLE OF CONTENTS
About this book
Chapter 1 - TRANSMISSION LINES & EQUIPMENT
1.1 Types o6 Cables
1.2 Transmission Overhead Towers
1.3 Installation Methods
1.4 Equipment
Chapter 2 - HAZARDOUS FACTORS WHILE WORKING NEAR TRANSMISSION LINES
2.1 Hazardous Factors
2.2 Hazard Levels
2.3 Precautionary measures to eliminate hazards
Chapter 3 - NOC FOR CONSTRUCTION WORKS
3.1 General Provisions
3.2 Type o6 NOC’s
3.3 Requirements 6or the Application o6 NOC
3.4 Transmission Line Maintenance NOC Conditions
3.5 Submission o6 Application
Chapter 4 - PROTECTIVE REGULATIONS & PRECAUTIONARY MEASURES FOR THE PROTECTION OF TRANSMISSION LINES
4.1 In6rastructure Works
4.2 Installation o6 new cables or troughs o6 any voltage
4.3 Installation o6 pipelines (Pressurized water/Gas/Irrigation/Fuel/Chilled water
pipe lines works & Gravity lines such as drainage, storm water line, sewerage)
4.4 Construction o6 Buildings, Boundary Wall, Temporary Fencing and Interlocking
4.5 Drilling / Boring / Anchoring / Micro tunneling / Piling / NDRC works (wherever applicable)
4.6 Telecommunication services such as Etisalat / Du (services /duct laying)
4.7 Miscellaneous Construction Works (Sign Board, Lighting Pole, Bore Holes,
Piling, Parking Area, Tree Plantation Etc)
Chapter 5 - IMPLEMENTATION OF NOC CONDITIONS & PRECAUTIONARY MEASURES
5.1 Patrolling
5.2 Pre-Commission Inspection
5.3 Contractor’s Work Supervision
5.4 Site Instruction Notice
5.5 Notice to Stop Work
5.6 Awareness Tool Box talk
Chapter 6 - ACTIONS AGAINST VIOLATORS
6.1 Legal Requirements.
6.2 Black Points System
Chapter 7 - SERVICES PROVIDED BY TLM
7.1 Trial pit / OHL VeriLcation & Supervision
7.2 Construction Work Supervision
Download Timer

