Handbook for UG & Overhead Lines


TABLE OF CONTENTS

About this book 

Chapter 1 - TRANSMISSION LINES & EQUIPMENT

1.1 Types o6 Cables
1.2 Transmission Overhead Towers
1.3 Installation Methods 
1.4 Equipment 

Chapter 2 - HAZARDOUS FACTORS WHILE WORKING NEAR TRANSMISSION LINES

2.1 Hazardous Factors
2.2 Hazard Levels 
2.3 Precautionary measures to eliminate hazards 

Chapter 3 - NOC FOR CONSTRUCTION WORKS

3.1 General Provisions 
3.2 Type o6 NOC’s 
3.3 Requirements 6or the Application o6 NOC 
3.4 Transmission Line Maintenance NOC Conditions 
3.5 Submission o6 Application

Chapter 4 - PROTECTIVE REGULATIONS & PRECAUTIONARY MEASURES FOR THE PROTECTION OF TRANSMISSION LINES

4.1 In6rastructure Works 
4.2 Installation o6 new cables or troughs o6 any voltage 
4.3 Installation o6 pipelines (Pressurized water/Gas/Irrigation/Fuel/Chilled water
pipe lines works & Gravity lines such as drainage, storm water line, sewerage)
4.4 Construction o6 Buildings, Boundary Wall, Temporary Fencing and Interlocking 
4.5 Drilling / Boring / Anchoring / Micro tunneling / Piling / NDRC works (wherever applicable)
4.6 Telecommunication services such as Etisalat / Du (services /duct laying) 
4.7 Miscellaneous Construction Works (Sign Board, Lighting Pole, Bore Holes,
Piling, Parking Area, Tree Plantation Etc) 

Chapter 5 - IMPLEMENTATION OF NOC CONDITIONS & PRECAUTIONARY MEASURES

5.1 Patrolling
5.2 Pre-Commission Inspection 
5.3 Contractor’s Work Supervision
5.4 Site Instruction Notice
5.5 Notice to Stop Work
5.6 Awareness Tool Box talk 

Chapter 6 - ACTIONS AGAINST VIOLATORS

6.1 Legal Requirements.
6.2 Black Points System
Chapter 7 - SERVICES PROVIDED BY TLM
7.1 Trial pit / OHL VeriLcation & Supervision 
7.2 Construction Work Supervision 


You have to wait 10 seconds.

Download Timer

*

Post a Comment (0)
Previous Post Next Post