132 kV GIS Ayios Athanasios Substation at Limassol


1.1 DESCRIPTION OF THE PROJECT

 
The Project works are to be carried out mainly in the town of Limassol, which is situated in
the Southern coast of Cyprus. The Project includes the establishment of a new 132/22-11kV substation in the town of Limassol, named “Ayios Athanasios” substation. It also includes small protection refurbishment works at two existing 132kV substations, in order to match the protection of the new substation


1.2 EXTENT OF CONTRACT

The Contract is on a turnkey basis and provides for all parts of the work, excluding civil works,
to be completed in every respect for commercial operation to the requirements of the Engineer.

1.2.1 Work Description

The Contract covers the design, manufacture, inspection and testing at the maker's works
and at site, packing for export shipment, insurance, transport and delivery to site or store, unloading, customs clearance, complete erection, testing and setting to work and
maintenance for a period of twelve (12) months of the works described below and detailed in the Schedules at the fixed scheduled prices:

1.2.1.1 Ayios Athanasios Substation

Establish a new 132/22-11 kV GIS substation with two 40 MVA 132/23-11,5 kV transformers
and a 33-panel 22kV switchboard.
1.2.1.2 Old Power Station Substation
Installation and Commissioning of two new main protection relays on the existing 132kV
Protection Relay Panel.

1.2.1.3 Yermasoyia Substation

Installation and Commissioning of two new main protection relays on the existing 132kV
Protection Relay Panel.

The Contract provides for all parts of the work to be completed in every respect for commercial operation to the requirements of the Engineer not withstanding that any details,
accessories, etc. required for the complete installation and satisfactory operation of the Plant are not specifically mentioned in the Specification, such details are to be considered as included in the Contract Price.
It also includes training of staff at manufacturer's works and at site as per relevant Schedule

1.3 CONTRACT TERMINAL POINTS
The Contract does not include:

(a) 132kV cables, multipair cables, or fiber optic cables between Ayios Athanasios substation
and Yermasoyia, Old Power Station, Moni and Polemedhia substations.

(b) Communications and System Control Equipment.

The following shall be the Contract Terminal Points:

1.3.1 Ayios Athanasios Substation

1.3.1.1 132 kV GIS Switchgear - Outgoing Cable Feeders

The cable termination arrangement on the GIS switchgear shall be suitable for accepting the
cable sealing ends, which will be provided and fitted by the Cable Contractor. The
Switchgear Contractor will be required to agree the final coordination of the sealing end
interface with the Cable Contractor.

1.3.1.2 22 kV Switchboard

The Contractor's responsibility ends on the terminals of the cable boxes of the outgoing
feeders of the 22kV switchboard.

The termination of outgoing 22kV feeders to the 22kV switchboard is not included in this
Contract. However the supply of the termination accessories of all outgoing and spare incoming feeders of the switchboard is included in this Contract.

1.3.1.3 Communication Panel

In the case of current differential protection relays through fiber optic media, the Contractor
shall be responsible for connecting and terminating up to the multiplexer communication panel, which shall be provided by others, or the main fiber optic termination box as specified elsewhere in this Contract.

1.3.1.4 132 kV and 22 kV Power Cables

All 132 kV and 22 kV power cables required for the completion of works at the substation
will be provided by the Purchaser. All accessories and works required for connecting
these power cables will be the responsibility of the Supplier/Contractor. The Supplier/Contractor will not be responsible for the guarantee of the power cables but will
be responsible for the guarantee of all connections.

1.3.2 Old Power Station Substation

The Contractor shall be responsible for dismantling of the existing two main protection relays, which should be delivered at EAC stores, and the installation, setting up and commissioning of new distance and current differential relays to the existing 132kV protection relay panel in order for the circuit to work.

1.3.3 Yermasoyia Substation

The Contractor shall be responsible for dismantling of the existing two main protection relays,

which should be delivered at EAC stores, and the installation, setting up and commissioning
of new distance and current differential relays to the existing 132kV protection relay panel in
order for the circuit to work.

1.4 PLANT ERECTION, TESTING AND COMMISSIONING

The Tenderer shall include the provision of all labor, technicians, testing and supervisory
engineers to install, test and commission the plant supplied under the Contract to the
agreed program and shall include all costs associated with the activity including the cost
of providing all necessary test equipment.

The Tenderer shall fully consider the Regulations regarding the use of local labor for site works and clarify in his offer where expatriate staff will be used on site activities.

Directions and instructions given by the Engineer's Representative or the Purchaser to the supervisors shall be interpreted as having been given to the Contractor.

The supervisors shall be well qualified by long training and experience in the installation and
operation of equipment of the type covered by the Specification. They shall liaise with the
Engineer and the Purchaser's staff in respect of the installation, testing and placing into
operational service of the substation equipment supplied under other contracts leading to commissioning of the complete substation or extension and for this purpose the English language shall be used.

1.5 BUILDINGS

Unless otherwise specified all substation buildings, foundations, walls, roof coverings,
concrete floor fittings, ducts and pipework embedded in the foundations, trenches with floor plates for cables, etc., will be provided under other contracts. Tenderers should take into consideration the following:

• dimensions specified as per drawings

• applied maximum load (including impulse load) on the floor of the GIS switchgear room
should not exceed 20 kN/m2

• the available crane in the GIS room can carry a maximum load of 5.000 kg.
The magnitude of the loadings from plant or equipment onto foundations must be stated by
the Tenderer. The loadings shall be confirmed by the dates given in the appropriate
schedule.

The Tender Drawings show the preferred layouts of all plant, equipment and buildings.
Dimensions in these Drawings have been based on typical sizes of plant and equipment.
The Contractor should ascertain for himself during the tender stage that the plant he
proposes to supply will be suitable for the arrangements shown on Tender Drawings, and the Contract Price is deemed to include the cost of any modified layout to meet the Employer's design principles. Failure of the Engineer or Employer to comment on drawings submitted by the contractor during the tender stage which show modified arrangements not complying with Tender Drawings and Design Principles shall not be accepted as approving such arrangements; any modifications proposed should be clearly stated in the Schedule of Departures.