Installation - Testing - Commissioning - Dubai Electricity & water Authority


Dubai Electricity & Water Authority (DEWA) is known for its stringent standards and meticulous processes when it comes to the installation, testing, and commissioning of electrical and water infrastructure projects. Here's an overview of the typical procedures involved in these phases:

  1. Installation:

    • Preparation: Before installation begins, detailed engineering plans are developed in accordance with DEWA's standards and regulations. This includes site surveys, environmental assessments, and procurement of necessary materials and equipment.
    • Construction: Skilled labor and specialized contractors carry out the installation of electrical substations, transmission lines, distribution networks, and water facilities. Adherence to safety protocols and quality control measures is paramount at every stage of construction.
    • Inspection: DEWA inspectors closely monitor the installation process to ensure compliance with approved designs and specifications. Any deviations or discrepancies are addressed promptly to maintain the integrity of the infrastructure.
  2. Testing:

    • Factory Acceptance Tests (FAT): Critical components such as transformers, switchgear, and control systems undergo rigorous testing at the manufacturer's facilities to verify performance and quality before installation.
    • Site Acceptance Tests (SAT): Once installed, each system and subsystem undergoes comprehensive testing to ensure functionality, reliability, and safety. This includes insulation resistance tests, continuity checks, relay coordination tests, and functional performance tests.
    • Integration Testing: Various components are tested together to ensure seamless operation and interoperability. This involves simulating real-world scenarios and verifying communication protocols between different systems.
  3. Commissioning:

    • Energization: After successful testing, the infrastructure is energized gradually, following established procedures to prevent overloads or equipment damage. Voltage levels are increased incrementally, and protective devices are closely monitored during this process.
    • Functional Checks: Commissioning engineers verify the performance of all systems under load conditions, including power generation, transmission, distribution, and water treatment. Any issues or anomalies are addressed promptly to ensure smooth operation.
    • Documentation: Detailed documentation of commissioning activities, test results, as-built drawings, and operational procedures is compiled for future reference and regulatory compliance.

DEWA places great emphasis on safety, reliability, and efficiency throughout the installation, testing, and commissioning phases. Stringent quality assurance measures, adherence to international standards, and continuous training of personnel contribute to the successful completion of projects that meet the growing demand for electricity and water services in Dubai.