Saudi Electricity - Electrical System Commissioning Manual


An Electrical System Commissioning Manual is a comprehensive document designed to guide engineers and technicians through the process of commissioning an electrical system. It serves as a reference guide to ensure that the installation meets design specifications and operates reliably and safely. Here are key elements typically included in such a manual:

  1. Introduction:

    • Overview of the purpose and scope of the manual.
    • Explanation of the importance of commissioning for ensuring system reliability and safety.
  2. Project Information:

    • Detailed information about the project, including location, design specifications, and key stakeholders.
    • Identification of electrical components and systems involved in the commissioning process.
  3. Commissioning Plan:

    • A step-by-step plan outlining the commissioning process.
    • Detailed schedule and milestones for each phase of commissioning.
  4. Roles and Responsibilities:

    • Clear definition of roles and responsibilities for each team member involved in the commissioning process.
    • Designation of a commissioning manager and other key personnel.
  5. Safety Procedures:

    • Comprehensive safety guidelines and procedures for all personnel involved in the commissioning.
    • Emergency response plans and procedures.
  6. Pre-Commissioning Checks:

    • Detailed checklists for pre-commissioning inspections and tests.
    • Verification of equipment installation, alignment, and connections.
  7. Testing Procedures:

    • Comprehensive procedures for conducting various tests, including insulation resistance, continuity, dielectric strength, and functional tests.
    • Step-by-step instructions for conducting load tests and voltage/frequency checks.
  8. Documentation Requirements:

    • List of required documentation for each phase of commissioning.
    • Instructions for maintaining detailed records and logs of all test results and observations.
  9. Commissioning of Specific Equipment:

    • Detailed procedures for commissioning specific electrical equipment such as transformers, switchgear, relays, and control systems.
    • Calibration and testing procedures for protection relays.
  10. System Integration Tests:

    • Procedures for conducting system integration tests to ensure proper coordination and communication among different components.
    • Verification of control system functionality.
  11. Commissioning Reports:

    • Templates for commissioning reports summarizing the results of each test and inspection.
    • Documentation of any deviations from design specifications and corrective actions taken.
  12. Training Requirements:

    • Identification of training needs for operating and maintenance personnel.
    • Procedures for conducting training sessions.
  13. Final Commissioning and Handover:

    • Procedures for the final commissioning of the entire electrical system.
    • Guidelines for the systematic handover of the system to the operations and maintenance teams.
  14. As-Built Drawings and Documentation:

    • Requirements for updating and maintaining accurate as-built drawings and documentation.
    • Procedures for documenting any changes made during the commissioning process.

A well-structured Electrical System Commissioning Manual ensures a systematic and organized approach to the commissioning process, facilitating the successful integration and operation of the electrical system.